Updated 5.25.17 |
2018 Projects (goal to complete 5 mile loop):
Finish small connecting sections on Shackle Rod Trail on the north side to complete a continuous loop. This will require about half a mile of benchcutting in three short sections. There will also be some maintenance and finishing work needed along the entire north side.
Complete Hangdog Spraylord (the amphitheater trail) and connectors. Less than half a mile of benchcutting.
Geometric and maintenance work on Flat Hollow Arch Trail and Rock Jock. Spot improvements.
Construct eastern loop of Rock Jock. (Roughly 0.25 mi. to 0.5 mi. of benchcutting to complete 0.75 mi. connection)
Throughout system: install signage and blazes.
2018 and beyond (goal to build out 10+ mile system):
Expand and improve southern segments of Shackle Rod Trail
Develop Future BRRP Loop (Upper Bald Rock).
Develop Future Phase Shackle Rod Trail (Upper Sore Heel)
Develop Jug Holler Trail (not shown)
Develop low line trail (not shown)
2018 and beyond (goal to build out 10+ mile system):
Expand and improve southern segments of Shackle Rod Trail
Develop Future BRRP Loop (Upper Bald Rock).
Develop Future Phase Shackle Rod Trail (Upper Sore Heel)
Develop Jug Holler Trail (not shown)
Develop low line trail (not shown)