These are a list of potential and ongoing trail projects in the Red River Gorge area. For more information contact caverunredrivermba@gmail.com
See separate pages (menu to the right) for detailed info on specific projects.
Short Range Projects:
Finish Bald Rock Fork loop
Scout alignments in Coalbank Hollow
Scout Bear Track-to-Beattyville connection via Contrary Creek and White Ash Road
Identifying and mapping gravel and adventure rides in the area
Maintenance on Powder Mill Branch Trail and others.
Medium Range Projects:
Lone Oak / Horse Ridge trail system (Powell-Estill County Line to connect Irvine/Ravenna to Cottage Furnace and Cottage Furnace to Fitchburg Furnace)
Develop and construct Coalbank trail system
Develop Crystal Creek Trail (Beattyville to Bald Rock)
Improvements to existing Powder Mill Branch Trail
Long Range Projects:
Tarr Ridge trail system
Expand Bald Rock system (Sore Heel and BRRP)
Develop Beattyville-Big Sinking Loop
Expansion of Powder Mill Branch Trail
No comments:
Post a Comment